Skip to content

Configure Renovate - #297

Closed
renovate[bot] wants to merge 2 commits into
masterfrom
renovate/configure
Closed

renovate[bot] wants to merge 2 commits into
masterfrom
renovate/configure

Tighten Renovate config: cap PR volume, skip majors and Go toolchain …

d57b792
Select commit
Loading
Failed to load commit list.
Travis CI / Travis CI - Branch succeeded Nov 12, 2026 in 2m 45s

Build Passed

The build passed, just like the previous build.

Details

This is a normal build for the renovate/configure branch. You should be able to reproduce it by checking out the branch locally.

Jobs and Stages

This build has two jobs, running in parallel.

Stage 1: test

This stage passed.

Job Go OS State
681.1 Go 1.14 1.14.x Linux passed
681.2 Go 1.15 1.15.x Linux passed

Build Configuration

Build Option Setting
Language Go
Operating System Linux (Focal)
Build Configuration
{
  "language": "go",
  "os": [
    "linux"
  ],
  "dist": "focal",
  "jobs": {
    "include": [
      {
        "stage": "test",
        "name": "Go 1.14",
        "go": "1.14.x",
        "install": [
          "skip"
        ],
        "script": [
          "GO111MODULE=on go test -v -race -coverprofile=coverage.txt -covermode=atomic ./..."
        ]
      },
      {
        "stage": "test",
        "name": "Go 1.15",
        "go": "1.15.x",
        "install": [
          "skip"
        ],
        "script": [
          "GO111MODULE=on go test -v -race -coverprofile=coverage.txt -covermode=atomic ./..."
        ]
      }
    ]
  }
}