Skip to content

Configure Renovate - #297

Closed
renovate[bot] wants to merge 2 commits into
masterfrom
renovate/configure
Closed

renovate[bot] wants to merge 2 commits into
masterfrom
renovate/configure

Conversation

@renovate

@renovate renovate Bot commented Oct 1, 2026 •

Copy link
Copy Markdown

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.

📚 See our Reading List for relevant documentation you may be interested in reading.

🔡 Do you want to change how Renovate upgrades your dependencies? Add your custom config to renovate.json in this branch. Renovate will update the Pull Request description the next time it runs.


Detected Package Files

  • Dockerfile (dockerfile)
  • .github/workflows/go.yml (github-actions)
  • go.mod (gomod)
  • helm/values.yaml (helm-values)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Hopefully safe environment variables to allow users to configure.
  • Show all Merge Confidence badges for pull requests.
  • Enable Renovate Dependency Dashboard creation.
  • Use semantic commit type fix for dependencies and chore for all others if semantic commits are in use.
  • Ignore node_modules, bower_components, vendor and various test/tests (except for nuget) directories.
  • Group known monorepo packages together.
  • Use curated list of recommended non-monorepo package groupings.
  • Show only the Age and Confidence Merge Confidence badges for pull requests.
  • Apply crowd-sourced package replacement rules.
  • Apply crowd-sourced workarounds for known problems with packages.
  • Update vulnerable PHP runtime pins for CVE-2026-109618 and CVE-2026-109619.
  • Ensure that every dependency pinned by digest and sourced from Forgejo contains a link to the commit-to-commit diff
  • Ensure that every dependency pinned by digest and sourced from Gitea contains a link to the commit-to-commit diff
  • Ensure that every dependency pinned by digest and sourced from GitHub.com and Github enterprise contains a link to the commit-to-commit diff
  • Ensure that every dependency pinned by digest and sourced from GitLab.com contains a link to the commit-to-commit diff
  • Correctly link to the source code for golang.org/x packages
  • Link to pkg.go.dev/... for golang.org/x packages' title
  • Provide a link to octochangelog's improved breakdown for Renovate's changelogs

What to Expect

With your current configuration, Renovate will create 3 Pull Requests, up to a maximum of 23 over time (see docs for prConcurrentLimit), plus 2 security update Pull Requests which are not subject to this limit:

Update module github.com/jackc/pgx/v4 to v4.18.2 [SECURITY]
  • Branch name: renovate/go-github.com-jackc-pgx-v4-vulnerability
  • Merge into: master
  • Upgrade github.com/jackc/pgx/v4 to v4.18.2
Update module github.com/valyala/fasthttp to v1.34.0 [SECURITY]
Update github.com/blagojts/viper digest to 97ee7ad
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-blagojts-viper-digest
  • Merge into: master
  • Upgrade github.com/blagojts/viper to 97ee7adfef4882d78c0ef26e22a0c8a7a8bf6776
Update github.com/timescale/promscale digest to 6ee8545
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-timescale-promscale-digest
  • Merge into: master
  • Upgrade github.com/timescale/promscale to 6ee8545bf30d3bd1ba778cba1736eb0ac21169fe
Update module github.com/golang/snappy to v0.0.4
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-golang-snappy-0.x
  • Merge into: master
  • Upgrade github.com/golang/snappy to v0.0.4
Update module github.com/shirou/gopsutil to v3.21.11+incompatible
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-shirou-gopsutil-3.x
  • Merge into: master
  • Upgrade github.com/shirou/gopsutil to v3.21.11+incompatible
Update actions/setup-go action to v6.5.0
  • Schedule: ["at any time"]
  • Branch name: renovate/actions-setup-go-6.x
  • Merge into: master
  • Upgrade actions/setup-go to 924ae3a1cded613372ab5595356fb5720e22ba16
Update alpine Docker tag to v3.24.4
  • Schedule: ["at any time"]
  • Branch name: renovate/alpine-3.x
  • Merge into: master
  • Upgrade alpine to 3.24.4
Update module github.com/aws/aws-sdk-go to v1.55.8
  • Schedule: ["at any time"]
  • Branch name: renovate/aws-sdk-go-monorepo
  • Merge into: master
  • Upgrade github.com/aws/aws-sdk-go to v1.55.8
Update module github.com/golang/protobuf to v1.5.4
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-golang-protobuf-1.x
  • Merge into: master
  • Upgrade github.com/golang/protobuf to v1.5.4
Update module github.com/google/flatbuffers to v1.12.1
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-google-flatbuffers-1.x
  • Merge into: master
  • Upgrade github.com/google/flatbuffers to v1.12.1
Update module github.com/google/go-cmp to v0.7.0
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-google-go-cmp-0.x
  • Merge into: master
  • Upgrade github.com/google/go-cmp to v0.7.0
Update module github.com/HdrHistogram/hdrhistogram-go to v1.4.0
Update module github.com/jmoiron/sqlx to v1.4.0
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-jmoiron-sqlx-1.x
  • Merge into: master
  • Upgrade github.com/jmoiron/sqlx to bc916999dc0011f5caf1f0d40e898ea9f839f4ea
Update module github.com/kshvakov/clickhouse to v1.5.4
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-kshvakov-clickhouse-1.x
  • Merge into: master
  • Upgrade github.com/kshvakov/clickhouse to v1.5.4
Update module github.com/lib/pq to v1.12.3
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-lib-pq-1.x
  • Merge into: master
  • Upgrade github.com/lib/pq to v1.12.3
Update module github.com/prometheus/common to v0.74.0
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-prometheus-common-0.x
  • Merge into: master
  • Upgrade github.com/prometheus/common to v0.74.0
Update module github.com/spf13/cobra to v1.10.2
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-spf13-cobra-1.x
  • Merge into: master
  • Upgrade github.com/spf13/cobra to v1.10.2
Update module github.com/spf13/pflag to v1.1.0
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-spf13-pflag-1.x
  • Merge into: master
  • Upgrade github.com/spf13/pflag to v1.1.0
Update module go.uber.org/atomic to v1.12.0
  • Schedule: ["at any time"]
  • Branch name: renovate/go.uber.org-atomic-1.x
  • Merge into: master
  • Upgrade go.uber.org/atomic to v1.12.0
Update module golang.org/x/net to v0.62.0
  • Schedule: ["at any time"]
  • Branch name: renovate/golang.org-x-net-0.x
  • Merge into: master
  • Upgrade golang.org/x/net to 3de643db506517b3e652a13cc0b56034cea6b8e6
Update module golang.org/x/time to v0.16.0
  • Schedule: ["at any time"]
  • Branch name: renovate/golang.org-x-time-0.x
  • Merge into: master
  • Upgrade golang.org/x/time to fb013b3d305a26f5ef5350a6eaffc7c87a200383
Update module gopkg.in/yaml.v2 to v2.4.0
  • Schedule: ["at any time"]
  • Branch name: renovate/gopkg.in-yaml.v2-2.x
  • Merge into: master
  • Upgrade gopkg.in/yaml.v2 to v2.4.0

🚸 PR creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or overwhelm the project. See docs for prHourlyLimit for details. Security update Pull Requests are not subject to this limit and will be created straight away.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR was generated by Mend Renovate. View the repository job log.

@CLAassistant

CLAassistant commented Oct 1, 2026 •

Copy link
Copy Markdown

CLA assistant check
Thank you for your submission! We really appreciate it. Like many open source projects, we ask that you all sign our Contributor License Agreement before we can accept your contribution.
1 out of 2 committers have signed the CLA.

✅ mattstratton
❌ renovate[bot]
You have signed the CLA already but the status is still pending? Let us recheck it.

…bumps

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
mattstratton added a commit that referenced this pull request Nov 12, 2026
Cap concurrent PRs at 3, skip major updates and Go toolchain bumps.
Supersedes #297.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants