Skip to content

chore(governance): cierre honesto de Charter-01, Charter-02 (M0–M6), ADRs y Milestones#62

Merged
montfort merged 1 commit into
mainfrom
chore/gobernanza-replanteo
Jul 4, 2026
Merged

chore(governance): cierre honesto de Charter-01, Charter-02 (M0–M6), ADRs y Milestones#62
montfort merged 1 commit into
mainfrom
chore/gobernanza-replanteo

Conversation

@montfort

@montfort montfort commented Jul 4, 2026

Copy link
Copy Markdown
Contributor

Qué es

Ejecuta las acciones de gobernanza C1–C5 del plan de replanteo (new-guide/08-plan-actualizacion-guia.md, aprobado en PR #61). El proyecto transita formalmente al esquema de milestones por capacidad demostrable.

Contenido

C1 — Cierre honesto de CHARTER-01

  • status: closed (2026-07-04) + telemetría validada contra schema (CHARTER-01.telemetry.yaml).
  • completed_as_planned: false, scope_changes: mayor: Fases 0–5 entregadas con calidad auditada; Fase 6 (tag) no ejecutada porque su gate era incorrecto — checklist de features sin criterio de capacidad. No es fracaso de ejecución sino corrección de criterio; así queda registrado en ## Closing notes.
  • FU-010/FU-011 (fechas tag-time) transferidos al cierre de CHARTER-02.

C2 — CHARTER-02 "Road to functional v0.1" (declared)

  • Fases = milestones de capacidad M0–M6 (triage → login GOA → delta real → hidratación → bidireccional → 24h+ → conflictos sin pérdida).
  • Superficie de archivos declarada desde código leído; riesgos R1–R5 con mitigaciones de umbral concreto (destaca R1: scopes GOA↔Graph, primer gate de M1 con fallback PKCE).
  • El cierre está gateado por el tag v0.1.0-alpha.1 (D4).

C3 — Decisiones formalizadas

Doc Decisión
ADR-2026-07-04-001 (draft, review) D1: restaurar delimitación de crates — incremental; M6 nace en lnxdrive-conflict; extracción de audit en v0.2
ADR-2026-07-04-002 (draft, review) D3: telemetría interna-only; export externo (OTLP→Google Cloud) descartado — promesa de privacidad absoluta y verificable
AIDEC-2026-07-04-001 D2: GOA como vía de login GNOME; PKCE loopback como ruta universal

⚠️ Los dos ADRs requieren tu aprobación (straymark approve o edición de frontmatter al revisar).

C4 — GitHub Milestones

C5 — Follow-ups

  • FU-016: cablear refresh de token en runtime (→ M5).
  • FU-017: unificar rutas de auth divergentes (→ M1, diseño AIDEC-001).
  • Registrados vía AILOG-2026-07-04-001 §Follow-ups + followups drift --apply (registro en el mismo commit).

Verificación

  • straymark validate → 0 errores (86 documentos).
  • straymark charter list → 01 closed / 02 declared.
  • straymark followups drift → registro en sync (8 open / 17 total).
  • 10 milestones en GitHub (3 versión + 7 capacidad).

Siguiente paso (tras merge)

Fase B del plan: reescritura de la guía canónica (B1 hoja de ruta + B4 testing primero), y arranque del batch M0 de CHARTER-02.

🤖 Generated with Claude Code

…D1/D3, AIDEC D2

Executes governance actions C1-C5 of the replanteo plan (new-guide/08, PR #61):

- C1: CHARTER-01 closed by redefinition — telemetry validated against schema
  (completed_as_planned: false, scope_changes: mayor). Fases 0-5 delivered with
  audited quality; Fase 6 (tag) NOT executed because its gate was wrong
  (feature-checklist without capability criteria). Closing notes added.
- C2: CHARTER-02 'Road to functional v0.1' declared — phases are the capability
  milestones M0-M6; load-bearing file surface declared from READ code; R1-R5
  with concrete-threshold mitigations; closure gated by the v0.1.0-alpha.1 tag.
- C3: ADR-2026-07-04-001 (D1: restore crate delimitation, incremental),
  ADR-2026-07-04-002 (D3: telemetry internal-only, external export discarded),
  AIDEC-2026-07-04-001 (D2: GOA for GNOME login, PKCE loopback universal).
  ADRs are draft + review_required for operator approval.
- C4: GitHub Milestones M0-M6 created (#4-#10); version umbrellas #1-#3 kept.
- C5: FU-016 (runtime token refresh -> M5) and FU-017 (divergent auth routes ->
  M1) registered via AILOG-2026-07-04-001 + followups drift --apply.

Validation: straymark validate 0 errors; followups registry in sync;
charter list shows 01 closed / 02 declared.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
@montfort montfort merged commit d3e2f39 into main Jul 4, 2026
5 checks passed
@montfort montfort deleted the chore/gobernanza-replanteo branch July 4, 2026 18:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant