Skip to content

Update pre-commit requirement from <4.0.0,>=2.17.0 to >=4.6.0,<5.0.0 #1791

Update pre-commit requirement from <4.0.0,>=2.17.0 to >=4.6.0,<5.0.0

Update pre-commit requirement from <4.0.0,>=2.17.0 to >=4.6.0,<5.0.0 #1791

Status Failure
Total duration 3m 5s
Artifacts

test_full.yml

on: push
codestyle
53s
codestyle
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.9)
Process completed with exit code 2.
test (3.12)
The strategy configuration was canceled because "test._3_9" failed
test (3.12)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_9" failed
test (3.10)
The operation was canceled.
test (3.13)
The strategy configuration was canceled because "test._3_9" failed
test (3.13)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_9" failed
test (3.11)
The operation was canceled.