Update pre-commit requirement from <4.0.0,>=2.17.0 to >=4.6.0,<5.0.0 #1791
Annotations
9 errors
|
test (3.9)
Process completed with exit code 2.
|
|
test (3.12)
The strategy configuration was canceled because "test._3_9" failed
|
|
test (3.12)
The operation was canceled.
|
|
test (3.10)
The strategy configuration was canceled because "test._3_9" failed
|
|
test (3.10)
The operation was canceled.
|
|
test (3.13)
The strategy configuration was canceled because "test._3_9" failed
|
|
test (3.13)
The operation was canceled.
|
|
test (3.11)
The strategy configuration was canceled because "test._3_9" failed
|
|
test (3.11)
The operation was canceled.
|